Providing a Comprehensive Perspective From All Facets
BID / PRECONSTRUCTION PHASE:
a. Biddability & general project scope review including:
- Bid item / bid form review including scope, quantites, and drawing details
- Participate in Design / Build Development
- Develop RFIs for Amendment as needed
- Identify Potential Value Engineering
- Constructability Review
- Specification Review in Coordination With Drawing Set
Note all design/bid services developed on a project specific basis.
b. Site Visit:
- Preconstruction photos
- Develop Familiarity with Site and Scope
- Observe & Document Existing Conditions
- Review Potential Storage Areas
- Review Proposed Sediment & Erosion Controls (SECs)
Note all site visit services developed on a project specific basis.
CONSTRUCTION PHASE:
Utilize MS Suite, BlueBeam, Procore software for overall RPR management and reporting.
- Complete daily reports including weather, manpower, deliveries, equipment, photo documentation, inspections, track unit items, work started, ongoing, and completed, CORs, visitors, and meetings.
- Perform regular QA/QC inspections and provide relevant reports back to client. Ensure items out of spec and resolved prior to completion and acceptance.
- Owner liaison – Resident Project Representative (RPR) Town of Warren, Plant Operators Engineers, and Regulatory Agencies
- Schedules – review project schedules including but not limited to, baseline, look-aheads, schedule of values, submittals, shop drawings, and develop fragnet schedules to analyze delays.
- Meetings - attend regular progress meetings, preconstruction meetings for major items of work, phone, and online conferences. Take and provide all notes to Engineer for record and distribution.
- Coordinate all plant interruptions due to construction sequence of operations and attend relative pre-con meetings.
- Attend vendor specific meetings for coordination, potential conflict, and overall client representation.
- Contractor Pay Applications – Review & recommend contractor’s monthly application for payment including review schedule of values, percent complete vs. work installed to-date, certified payrolls, AIS certificates, approved submittal status, retainage, and stored materials.
- Develop submittal log, closeout log, spare parts list, and RFI log in excel for on-site use.
- Review submittals and provide relative comments back to Engineer based on field conditions as applicable.
- Change Orders – review change order requests (CORs) and recommend / deny cost and scope. Review conducted with self-perform comparison estimate using relative indices for example MCA mechanical estimating, RS Means Building estimating, relative project bid item unit costs. Review also included schedule delay / savings and liquidated-damage analysis. Review included thorough analysis of all vendor quotes, published scope of work, attend major COR meetings, and provide scope input for design / cost modifications.
- Work closely with contractor to maintain regular inspections to avoid unacceptable work.
- Plan with contractor to mitigate delays in the work.
Special Inspections:
- Coordinate 3rd party inspections by Owner’s agents with contractor and relative parties.
- Specialty inspections - Perform/witness on-site specialty inspections with Engineer assistance including concrete sounding, specialty coating inspection, and soil characterization.
- Dutchland Tank – precast concrete post-tension tank installation. Witness post tensioning, grout of wall keys, sealing of all joints, and water testing per ACI requirement including:
- ACI 350.01-1 Qualitative observations – Visual Inspection, including moisture transfer assessment, visual checks of joints, cracks, honeycombs for leaking, weeping, and dampness.
- ACI 350.01-1 Quantitative observations – Water tightness / loss calculations factoring water volume, temperature, ambient air, humidity, precipitation, and time of day.
- Hydrostatic pipe pressure testing including development of pipe test certification form per contract requirements, joint inspection, material verification, soaking of cement lining, test pump-up and hold for test required time.
- Sludge tank coatings – sounding, infiltration inspection, depth gauge & coating coverage assessment for unit pricing payment. Witness 3rd party coating spark testing.
- Work with contractor to interpret contract documents, review & confirm all findings with Engineer.
- Witness pipe pressure tests, perform visual inspections of all piping, and support systems.
- Enter water tanks and confined space areas for inspection.
- Monitor concrete placements for temperature, witness 3rd party taking slump, concrete temperature, and air content tests. Monitoring concrete temperature with heat gun.
- Monitor specialty blower equipment package startup, witness air flow testing, develop spreadsheet to track over vibration and excessive noise levels as required by the contract documents.
Labor Relations:
- Maintain on-site certified payroll files for routine audit by DEM.
- Conduct regular SF 1445 site labor interviews to verify certified payroll & SRF Funding compliance.
- Attend educational site walk-thru with Town of Warren, Plant Operators, and RISD students.
Closeout
- Review and document field conditions and maintain as-built document set.
- Review all contractor submitted as-built data and assist engineer with updating formal / finalized drawings set with BlueBeam markups for final CAD file updating.
- Respond to emergency issues outside of normal business hours.
- Review predesign documentation to enforce agreed upon design features.
- Plan with contractor to mitigate delays in the work.
- Respond to emergency issues outside of normal business hours.